One Triway Building Updates

Building Update 3/27/24

Step Inside the Future of Learning at Triway!

We are excited to unveil a sneak peek inside the brand new PreK-12 building currently under construction.

This exciting animated flythrough takes you on a journey through the innovative learning spaces designed to empower and inspire our students.

The new building represents our commitment to providing an exceptional learning environment for every child in our district for many years to come.


 

Building Update 12/14/23

 

An aerial view of a new school under construction, with the text 'One Triway One Campus' and 'Building Our Future Together.'

 


 

Building Update 10/10/23

An aerial view of a large construction site with multiple buildings under construction.

An aerial view of a large building under construction, showing concrete walls, scaffolding, and an outdoor seating area.

An aerial view of a building under construction, showing steel beams and a concrete foundation.

A construction site with exposed steel beams and concrete walls.

A view of a building under construction, showing the steel framing and exterior walls.

Please click HERE if you’d like to see a flythrough of the current state of the building. 

 


 

Building Update 8/1/23

An aerial view of a school construction site, showing the progress of the new auditorium, gymnasium, and wings.

 


 

Building Update 6/21/23

An aerial view of a school construction site, showing new buildings under construction.

 


 

Building Update 6/9/23

An aerial view of a large construction site with several buildings under construction.

 

An aerial view of a construction site with concrete blocks and building materials.

 


 

Building Update 5/25/23

An aerial view of a construction site with workers building a large structure.

 

An aerial view of a large building under construction, showing concrete foundations, scaffolding, and stacks of building materials.

 


 

Building Update 5/16/23

An aerial view of a large construction site with multiple buildings under construction.

An aerial view of a construction site, showing a partially built structure with scaffolding and workers.

An aerial view of a school building under construction, showing the concrete walls and foundation.

 


 

Building Update 5/10/23

An aerial view of a large construction site with multiple buildings under construction.

An aerial view of a building under construction, showing workers on scaffolding and a crane in the background.

 


 

Groundbreaking Ceremony Video 4/20/23

Please click here to view the groundbreaking ceremony video. 

 


 

Groundbreaking Ceremony

Please review the following information in preparation for Thursday’s One Triway groundbreaking ceremony. 

The groundbreaking ceremony will be held in Lot A, closest to Shreve Road/State Route 226. This will cause the northern half of Lot A to be roped off for the event. The remaining open parking spots in Lot A will be reserved for guests with mobility concerns and handicap parking. These guests will enter Lot A using the temporary main entrance off of Shreve Road/State Route 226 (see included map).

We ask that all other traffic please enter from Valley Road, park in Lot B and Lot C, and walk to Lot A.  

Please see the included ceremony agenda for additional information about the evening’s events.

An aerial view of a school campus with a marked area for a new PreK-12 building construction project.

An invitation to the groundbreaking ceremony for the Triway PreK-12 School, featuring a rendering of the new building and the school mascot.

An event program listing speakers and performers for a groundbreaking ceremony.

A flyer for a community event with information about the Triway High School Marching Band, photo opportunities, refreshments, and a ceremonial keepsake.

An aerial view of the proposed Triway PreK-12 campus, featuring a large school building, athletic fields, and parking lots.

 


 

Construction Update 4/12/23

Overall site

An aerial view of a large construction site with buildings under construction.

 

Elementary gym and kitchen area

An aerial view of a construction site with a forklift pouring concrete into a foundation.

 

Elementary wing foundations

An aerial view of a construction site with workers and heavy machinery laying foundations.

 

High school and middle school gyms

An aerial view of a construction site, showing a large building under construction with workers on scaffolding.

 


 

Construction Update 3/29/23

Aerial view of the entire building site.

An aerial view of a large construction site with heavy machinery and excavated areas.

High school and middle school gymnasium walls

An aerial view of a construction site with a large brick wall being built.

 


 

Building Update 3/16/23

An aerial view of a modern school campus with a large building, parking lot, athletic fields, and surrounding trees.

 


 

Construction Update 3/10/23

Overall job site as of 3/9/23

An aerial view of a construction site with heavy machinery and workers building a new structure.

Progress on the fire suppression system holding tank, located under the north side mechanical room

An aerial view of a construction site with a large excavation, workers, and a concrete foundation.

Start of the elementary gymnasium foundations 

An aerial view of a construction site with a foundation being built, featuring rebar, pipes, and construction equipment.

Progress on the high school and middle school gymnasium foundations, as well as beginning foundations for locker room spaces

An aerial view of a construction site with heavy machinery, trucks, and workers preparing the ground for a new building.

 


 

Construction Update 3/8/23
Updated: Mar 10, 2023

In our last construction update, we communicated that due to winter conditions, we were expecting to have a dormant construction site until early spring. With a uniquely mild winter thus far, construction resumed mid-February. Much of the current activity is taking place underground, or is difficult to view from the vantage points on campus. In the coming weeks, vertical progress will be visible as gymnasium and auditorium walls begin to take shape. 

Routine updates, mainly pictures, will highlight the exciting changes in our One Triway site. In addition to these updates, a live construction feed is available at Construction Feed | One Triway.

Overall job site as of 3/6/23

An aerial view of a construction site with heavy machinery, workers, and a large concrete foundation.

This 19 foot deep hole will house the 58,000 gallon fire suppression system holding tank, to be located under the north side mechanical room

An aerial view of a construction site with a large square foundation being built, surrounded by orange safety netting.

Foundations for the high school and middle school gymnasiums on the southeast side of the building are in the early stages of being poured

An aerial view of a construction site with workers pouring concrete and operating heavy machinery.

Pathways for technology to the south side of the building

A construction site with a trench dug for utility lines, surrounded by dirt and machinery.

Deep trench on the west side of the job site for sanitary system work

An aerial view of a construction site with an excavator digging a trench and a pile of sand.

 


 

Building Update 1/20/23


Our team of dedicated professionals from GPD Group and Hammond are working diligently to maintain our One Triway building project timeline. Public communications released in May showed the completion of the One Triway campus trending away from the fall of 2024 to the fall of 2025. Recent developments, and the productivity in the early site work, indicate the completion of the building trending toward winter of 2024. This could create a situation where our secondary schools (grades 6 - 12) move into the new building mid-year (December 2024). 

A secondary mid-year move-in would allow for acceleration in the demolition and abatement of the current high school and middle school, which occupy the location of future parking lots. The development of these parking lots is critical in addressing the increased traffic from the transition of the elementary schools into the new building in the fall of 2025.

We are currently evaluating district systems, including school calendars, to ensure a smooth transition should a secondary mid-year move-in occur. While there are many construction related variables that could impact our timeline, we ask for your patience as we work through the implications of a possible mid-year move-in for grades 6-12. 

We will continue to update the community on our progress as information becomes available. Thank you for your support of Triway Local Schools.

 

 


 

Building Update 1/3/23

Construction Update

In March of 2022, construction crews mobilized on site for the first phase of work to transform our district into the One Triway campus. The initial work focused on installing stormwater controls, select tree removal, and developing a new parking lot and temporary entry needed for the next phase of work. This past summer and fall, massive sitework occurred to prepare the building area for construction of the new PreK-12 school. This involved putting up additional storm water controls and starting underground utilities. Contractors graded the soil and transformed the site elevations to accommodate the future building footprint. Perimeter fencing and signage was installed as a part of Hammond Construction’s site safety plan, ensuring a safe and secure environment for students and staff throughout the building process. 

The construction site will appear to be mostly dormant this winter; however, this is expected due to winter weather conditions.  Site activity will resume in the spring after winter weather has passed.  At that time, our community will celebrate a groundbreaking ceremony noting the start of the PreK-12 building construction. As soon as they are available, the details of this exciting event will be communicated.


New School Zone Approved

This past summer, an in-depth traffic study was conducted by traffic engineers from GPD Group. The Triway school administration, GPD, and Hammond worked with local officials, law enforcement, and Ohio Department of Transportation to analyze this study. Based on this analysis, a new school zone has since been approved, adding Valley Road to the current school zone plan. Traffic engineers are evaluating updated plans, in conjunction with state law, to identify the location of the new school zone. This includes the phasing in of new school zone signage, warning lights, and pavement markings along Valley Road. 

An aerial view of a construction site with heavy machinery and a school building in the background.

 


 

Building Update 9/22/22

GPD, our architect firm, recently shared an exciting animated view of the exterior of the new PreK - 12 building. This is the first 3D view that shows all sides of the building and includes features such as the main entrances, play areas, parking lots, and potential location of the memorial garden. This animation reflects the building still in draft form as exterior finishes have not yet been finalized. 

Click HERE for the OneTriway Exterior Animation

 


 

Building Update 9/9/22

Below you will find information on the new traffic pattern for Triway Middle School and Triway High School. Additionally, we have provided an animation to view this traffic pattern.

Click here to view the animation. 

A map showing the drop-off locations for high school and middle school students at Triway Middle/High School.

A map outlining the dismissal procedures for Triway Middle/High School, effective September 13, 2022.

A map showing parking areas for Triway Middle/High School, including ADA and visitor parking.

 


 

Building Update 8/17/22

An aerial view of the Triway High School campus, showing construction progress on a new school building and parking lot.

 


 

Building Site Plan Update 5/17/22

An aerial view of a school campus, showing the layout of the buildings, parking lot, and athletic fields.

 


 

Community Meeting 5/9/22

Triway Local Schools held a community meeting on 5/9/22 with information regarding the building project. Please click this link for a summary of the information shared during the meeting. Click here to view additional renderings

A conceptual rendering of a building with the text 'Triway' and 'Conceptual Rendering Not Final' on the front.

 


 

Upcoming Site Work April 11-15, 2022

An aerial view of the new One Triway Campus construction site, highlighting areas where trees will be removed.

 


 

Project Informational Flyer 4/4/22

A graphic with a purple background and a white cartoon mascot being lifted by a construction crane. The text reads 'ONETRIWAY ONECAMPUS Building Our Future Together' and 'An update on Triway Local School's PreK-12 building project.'

A graphic outlining the challenges faced by Triway Local Schools in building a new PreK-12 school, including the COVID-19 pandemic, funding delays, and supply chain disruptions.

A document outlining the progress of the One Triway One Campus project, highlighting the design development phase and addressing challenges.

A timeline for a new building project, outlining key milestones from site preparation to opening.

 


 

Building Update 4/4/22

Progress continues on development of the new Triway PK-12 campus. GPD and Hammond have been engaging with the school district administration and staff, board members, city officials, and various specialists to move the design forward. The district is committed to creating a facility that provides strong, innovative programs for students, safe and secure learning environments, and a gathering place for the Triway community.

An aerial view of a school campus with a purple-outlined building, a large parking lot, and a nearby athletic field.

A floor plan of a new school building, labeled 'Triway PK-12 - New Building', showing the layout of the elementary, middle, and high school sections.

A floor plan of a new school building, showing the layout of the elementary, middle, and high school sections.

 


 

Building Update 12/9/21
Updated: Apr 4, 2022

Plans for our new PK-12 building continue to evolve. After gathering valuable input on the first set of plans, significant changes include a more defined separation between elementary, middle and high school students; changing from three floors to two floors; and rotating the gyms and auditorium. The design is a work in progress, and we thank you for your continued support! 

An aerial view of a school campus with buildings, athletic fields, and parking lots. The text 'Triway PK-12' and 'Design Option A2' is visible.

A floor plan of Triway PK-12 school, showing the layout of classrooms, gymnasiums, and other facilities.

A floor plan of Triway PK-12 school, showing the layout of the second floor.

 


 

Building Update 12/9/21

As momentum begins to ramp up with our building project, we have added the final piece to our project team. Hammond Construction has been selected as our construction manager. This is a significant step as we move toward the next steps of the design phase, and the eventual ground breaking of our new facility. See below for more information about Hammond Construction and an introduction to the team working on our project.

A collage of images showcasing Hammond Construction's commitment to quality construction, community engagement, and employee growth.

A graphic showing the Triway Local School District's project team and recent K-12 clients of Hammond Construction.

 


 

Building Update 10/18/21
Updated: Apr 4, 2022

The new PK-12 building layout is beginning to take shape upon completion of intensive programming sessions with GPD Group. These sessions culminated in a Program of Requirements (POR) which is now being used to develop spatial adjacencies, refine departmental layouts, and analyze the building’s relationship with the site. Floor plans now reveal a general concept for placement of both academic and non-academic areas, while the site plan shows building orientation facing Shreve Road with a welcoming presence. 

An aerial view of a school campus with buildings, athletic fields, and parking lots.

A color-coded floor plan of Triway PK-12 school, showing the layout of classrooms and common areas.

A floor plan of Triway PK-12 school, showing the layout of the elementary, middle, and gymnasium areas.

A floor plan of Triway PK-12, showing the third floor layout with a high school building and roof areas.

 


 

Building Update 7/22/21

A project timeline with icons representing each stage: visioning, programming, schematic design, design development, construction documents, bid and award, construction, and close-out.

An aerial view of a school campus with proposed plans for a new building and athletic fields.

 


 

Educational Visioning Summary

A text-based graphic outlining the goals and vision for a new school building, emphasizing student success and the role of the teacher.

 


 

Meet the Architects

A collage of photos showcasing modern school interiors designed by GPD Group, an architecture and engineering firm.

An aerial view of a school campus with a football field and track, along with a text description of the new PK-12 building project.

 


 

Building Update 4/22/21

An aerial view of a school campus with a purple-outlined building, a large parking lot, and a nearby athletic field.

 


 

A purple logo with a mascot wearing a helmet, the words 'One Triway One Campus' and the tagline 'Building Our Future Together'.